Faqs Category: Upper Floor Deliveries

Yes — this is a common requirement on active construction sites. Our crane truck operators are trained in rigging and load control for exactly these situations. Site conditions, scaffold height, and load weight all factor into planning, so provide as much detail as possible when enquiring.

A straightforward telehandler lift of a standard plasterboard load to a second-floor frame takes 30–90 minutes depending on volume and site conditions. Crane jobs with rigging requirements take longer. We'll give you a realistic time estimate when you book so your crew can plan accordingly.

Our telehandlers comfortably reach second and third-floor level, which covers the majority of Adelaide residential and multi-res construction. Our crane trucks extend to 15m and 21m reach for taller or more complex structures. For specific height requirements, confirm with us at booking.

Significantly safer. Manual handling of heavy materials up stairs or ladders is one of the leading causes of injury on construction sites. Using a telehandler or crane truck eliminates that risk entirely, places materials faster, and removes the need for multiple crew members to be involved in what is otherwise a non-productive task.

Plasterboard, benchtops, joinery, stone, timber frames, roofing materials, glass, and palletised goods are all regularly lifted to upper floors by our team. If you have a specific material or unusual load, describe it when enquiring and we'll confirm the best approach.

 We use telehandlers for most upper-floor placements — they're fast, manoeuvrable, and ideal for second and third-storey access on residential and multi-res builds. For heavier lifts or more complex angles, we use crane trucks with 15m or 21m reach. The right choice depends on your load type, site access, and floor height — call us and we'll recommend the correct setup.

Permit requirements depend on whether the lift requires road occupation (e.g., a lane closure or parking suspension) rather than the lift itself. Our team is experienced with Adelaide City Council and outer council permit processes. If your job is likely to require road occupation, mention it when booking and we'll advise on what's needed.

Ideally, the landing zone on the upper level should be clear and structurally sound enough to accept the load. Your team should be aware of the delivery time and ready to receive and secure materials once placed. Our driver will do a brief site assessment on arrival and confirm the plan before any lifting begins.